Sullivan Athletic Field

Total Square Footage: 100,400 square feet
Cost: $650,000

Sam A. Winn & Associates, Architects, P.C. and the Sullivan School District have renovated or replaced all of their athletic facilities on their outdoor High School site.  Renovation to the existing football field consisted of replacing their grass field with an underground drainage system under the turf and installing a synthetic turf for mulit-use of football, soccer and physical education. Since the completion of the synthetic turf project, the baseball field and bleachers have been renovated, as well as a new concession stand and toilet facility constructed. This facility was completed Fall of 2009.

►Back to Portfolio