Crane R-III Media Center

Total Square Footage: 10,250 square feet
Cost: $1,400,000

The Crane R-III Media Center addition was constructed in 2008 connecting the High School and Elementary buildings. The media center addition between the schools gave the High School a state-of-the-art media center consisting of 10,250 square feet of library space, connecting corridor, storage, and two distant learning labs. Prior to the addition, the high school and elementary school shared a library located in the elementary school. This addition now gives all students an indoor and secure passageway between the two schools, with the media center as a focal point for public access.

►Back to Portfolio